You can sign up for the technical tour at the registration desk on Aug. 6th and Aug.7.
您可在8月6日、7日于会议签到处现场报名技术参观。
Ruiguang Electric Power Plant is located in south of Dongshagou Village, Wujinshan town. The plant has two 300 MWe heat supply units, which serves as the major heat resource for Taiyuan and Jinzhong. The heating area exceeds 16 million square meters thanks to the high back-pressure condensing heat utilization technology. Ruiguang Electric Power Plant is an advanced green power plant, which has developed high-standard De-NOx (Denitration), hydrometallurgical desulfurizing technique (wet desulfurizing technique), electrical-bag filter, wastewater treatment, full closure coal yard and other facilities. Besides, the reclaimed water of the city is used. It is quite successful in achieving the transformation of coal-fired power plants with ultra-low emissions, waste heat ladder utilization (waste heat step utilization), solid-waste multipurpose utilization (comprehensive utilization of solid-waste/ solid waste comprehensive utilization), and carbon dioxide capture.
Highlights:
1. The first coal-fired power plant in Shanxi Province achieving the dust removal electrical price.
2. The first domestic power plant using the reclaimed water of the city.
3. Multipurpose utilization of solid-waste and zero waste water drainage.
4. The first domestic power plant adopting physisorption method to capture carbon dioxide from the smoke and building an annual output of 3,000 tons of food-grade CO2 project.
5. The first 300 MW units realized ultra-low-emission in the middle-western China.
6. Granted as “the national demonstration power plant for energy saving and emission reduction” by National Energy Administration in 2016.